ploop migration with previou sync ? [message #51471] |
Sat, 21 June 2014 04:58 |
andre
Messages: 36 Registered: January 2008
|
Member |
|
|
Hello,
With ploop, when doing a migration, would it be possible to do an initial copy and delay the migration progress?
I mean, based on what we've tested, when you fire up the migration proccess, it will do everything until the end (copy, shutdown source, sync, turn on destination). We'd like to have the inicial copy done at a different time (reason: final proccess would be schedulled).
Thanks
|
|
|