Force date shift in VM [message #50959] |
Fri, 13 December 2013 00:31  |
danaspinall
Messages: 2 Registered: December 2013
|
Junior Member |
|
|
Hi all.
I have a physical server running about 6 different RHES5 instances. As part of our application testing I need to be able to time shift 2 of the VMs to a date in the past, of over 31 days, to test some application logic.
I have found articles on how to fix NTP sync with the HN, but nothing specific about setting a completely different date override for specific VMs on the same server.
Does anyone know if it is possible? I don't mind the dirtiest of hacks as this is just for testing.
Any info much appreciated.
Dan.
|
|
|